Posted by: Windfair Editors
Siemens Gamesa Wins Largest Repowering Project in North America
Official Press Release Siemens Gamesa:
Siemens Gamesa awarded the largest repowering order to date in North America by MidAmerican Energy
The company will supply and install 163 SG 2.7-129 wind turbines, operating at 2.38 MW and 18 previously sold SWT-2.3-108 wind turbines to repower the Rolling Hills wind project (429.3 MW), with an option for 12 additional wind turbines
Siemens Gamesa has been selected by MidAmerican Energy Company for the Rolling Hills wind power project for a total of 429.3 MW, the largest repowering order to date in North America. The company will repower the project with 163 SG 2.7-129 and 18 previously sold SWT-2.3-108 wind turbines. Rolling Hills is located in Adair, Adams and Cass counties in Iowa and currently features 193 SWT-2.3-101 turbines. The repowering project includes replacement of the blades, hubs and nacelles for all units, and top tower sections for the SG 2.7-129... ... More: Official Press Release Siemens Gamesa
- Keywords:
- Siemens Gamesa, repowering, Iowa, USA, North America, upgrade, Rolling Hills