2024-12-23
https://w3.windfair.us/wind-energy/news/31899-ge-spain-wind-turbine-wind-farm-enerfin-valencia-manufacturing-hub-height-onshore-service

Enerfín Chooses GE Renewable Energy as Turbine Supplier

GE will supply turbines for the 50 MW Cofrentes wind farm, the first one to be built in the Valencian Community after eight years

Official Press Release GE Renewable Energy:

GE Renewable Energy and Enerfín team up in Valencia to construct 50 MW Cofrentes wind farm

Wind Industry Profile of
GE Renewable Energy and Enerfín team up in Valencia to construct 50 MW Cofrentes wind farm

Cofrentes is the first project between GE Renewable Energy and Enerfín / The 50 MW wind farm is the first one to be built in the Valencian Community after eight years / The scope of the projects highlights GE Renewable Energy's capabilities in Spain with operations, manufacturing of blades, services and digital monitoring to be done in country

Enerfín announced today the start of the construction of the 50 MW Cofrentes wind farm, which will be powered by 13 of GE Renewable Energy's onshore wind turbines. The project is the first between the two companies and marks the return of wind energy to the Valencian Community after an eight-year hiatus. The project will be powered by 13 of GE's 3.8-137 onshore wind turbines, with a hub height of 111.5m, ideally... ... More: Official Press Release GE Renewable Energy

Keywords:
GE, Spain, wind turbine, wind farm, Enerfin, Valencia, manufacturing, hub height, onshore, service







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us
  • Newlist_pce-instruments-logo-300dpi
  • Newlist_kaeufer_logo

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024