Posted by: Windfair Editors
ABO Wind Succeeds in First Technology-Neutral Tender in Finland
Official Press Release ABO Wind:
ABO Wind succeeds in Finnish tender
Approx. nine per cent of the tendered electricity goes to ABO Wind / Wind farm Kokkoneva wins bid in the first technology-neutral tender round / Permit for seven turbines with a height of up to 250 meters / Turbines to be commissioned by 1 January 2022
ABO Wind has won a bid to operate the Kokkoneva wind farm in the first technology-neutral tender for renewable energies in Finland. The Finnish Energy Authority tendered a total of 1.36 terawatt hours of annual electricity, equivalent to 1.36 million megawatt hours. ABO Wind has won a bid of more than 120,000 megawatt hours. This electricity will be produced by the wind farm Kokkoneva with seven turbines of up to 250 meters and a total output of approximately 30 megawatts. “Our successful bid underlines the... ... More: Official Press Release ABO Wind
- Keywords:
- Finland, tender, bid, technology-neutral, wind farm, MW, output, electricity