2024-12-23
https://w3.windfair.us/wind-energy/news/30480-ge-future-wind-netherlands-rotterdam-turbine-12-mw-prototype-testing-service-haliade-x-12-mw

Rotterdam Gets World's First 12 MW Turbine

GE Renewable Energy and Future Wind have agreed to install the prototype of the Haliade-X 12 MW in Maasvlakte-Rotterdam (NL) during summer 2019.

Official Press Release GE Renewable Energy:

GE's Haliade-X 12 MW prototype to be installed in Rotterdam

Wind Industry Profile of
GE's Haliade-X 12 MW prototype to be installed in Rotterdam

Agreement signed with Future Wind includes five years of testing and 15 years of service / Installation of Haliade-X 12 MW will take place during summer 2019

GE Renewable Energy and Future Wind (a Joint Venture between Pondera Development and SIF Holding Netherlands) announced today that they have signed an agreement to install the first Haliade-X 12 MW wind turbine prototype in Maasvlakte-Rotterdam (NL) during summer 2019. The deal includes five years of testing and a 15-year full service Operation and Maintenance agreement. This Haliade-X 12 MW prototype will be installed onshore to facilitate access for testing. During the initial period of operations, it will allow GE... ... More: Official Press Release GE Renewable Energy

Keywords:
GE, Future Wind, Netherlands, Rotterdam, turbine, 12 MW, prototype, testing, service, Haliade-X 12 MW







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo.drakawind
  • Newlist_logo.windfair-us

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024