Posted by: Windfair Editors
Lincoln Gap, Part 2: Senvion Gets Firm Order for Australian Wind Farm
Official Press Release Senvion:
Senvion converts 86 MW of Australian wind farm into firm order
Senvion converts 86 MW of Australian wind farm into firm order
Senvion has secured the Notice to Proceed with the construction of Stage 2, adding 86 MW to Nexif Energy's Lincoln Gap Wind Farm near Port Augusta in South Australia. Construction of Stage 1 is well underway and will feature 35 Senvion turbines. Stage 2 will see an additional 24 turbines installed and operating by mid-2020 adding 86 MW of generating capacity to the project. When complete, the Lincoln Gap wind farm will comprise 59 Senvion 3.6M140 turbines. Stages 1 and 2 combined will have a total generating capacity of over 212 MW, producing enough energy to power 155,000 households in South Australia. Nexif Energy has issued Senvion with Notice to Proceed and construction of Stage 2 of the... ... More: Official Press Release Senvion
- Keywords:
- Senvion, turbine, Australia, wind farm, turbine manufacturer, Nexif Energy, Lincoln Gap