2024-11-05
http://w3.windfair.us/wind-energy/news/29048-zephir-lidar-lidar-measurement-wind-mast-canada-wind-farm-boralex

Boralex Installs Grid-Compliant Permanent Met Lidars

ZephIR 300 wind Lidar replaces the need for an operational met mast on Port Ryerse Wind Farm, Ontario, Canada.

Official Press Release ZephIR Lidar:

Canadian grid moves from masts to Lidars on operational wind farms

Leading wind development company Boralex install grid-compliant Permanent Met Lidars, integrated in to Siemens wind turbines.

In response to IESO grid compliance, ZephIR 300 wind Lidar replaces need for operational met mast on Port Ryerse Wind Farm, Ontario, Canada. With more than 700MW of wind projects, Boralex command a majority share of the Canadian wind market. The company’s latest project, Port Ryerse Wind Farm, sees the deployment of a ZephIR 300 wind Lidar in accordance with grid operator IESO’s requirement for permanent measurements on site while further benefiting from improved health and safety practices in addition to the very low visual impact of the Lidar when compared to a traditional tall metal tower. The wind farm consists of... ... More: Official Press Release ZephIR Lidar

Keywords:
ZephIR Lidar, lidar, measurement, wind mast, Canada, wind farm, Boralex







Thematically suitable Windfair.net members in the business directory

  • Newlist_windhunter_service_2_
  • Newlist_pavana_logo_rgb_pfade_
  • Newlist_geonet_logo
  • Newlist_15.03.9_logo_gwu-umwelt_kurz__firma__gmbh_unterhalb_cmyk
  • Newlist_logo.ammonit
  • Newlist_windconsult-logo
  • Newlist_anemos_logo_neu
  • Newlist_windrad_logo-1-rgb
  • Newlist_logo.labkotec
  • Newlist_logo.overspeed
  • Newlist_logo.thies
  • Newlist_rosendahl_windtechnik_logo_weiss_neu_druck
  • Newlist_profecventus
  • Newlist_logo.engr.wisc
  • Newlist_logo_lambrecht_2022_rgb
  • Newlist_ts_logo_rgb
  • Newlist_logo.tuev-sued-offshore
  • Newlist_cga_logo
  • Newlist_bmu_logo
  • Newlist_logo.leitwind

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024