Posted by: Windfair Editors
First Tower Segments for Arkona Offshore Wind Farm Arrived at Mukran Port
Official Press Release Mukran Port:
MPT handles first tower segments for Arkona offshore wind farm
After the first 36 of 180 wings over 70 meters in length were successfully transshipped for the Arkona-Becken Südost offshore wind farm, the new heavyweights arrived at the Mukran Port.
The port service provider Mukran Port Terminals (MPT) handled the first 6 tower segments (each about 130 tons) in a tandem lift at the Offshore Terminal North. Arkona Offshore WInd Farm: Arkona Offshore Wind Farm is located 35 km northeast of the island of Rügen in the German Baltic Sea. When it's finished in 2019 60 turbines with a capacity of 385 MW will produce clean energy for 400.000 households. ... More: Official Press Release Mukran Port
- Keywords:
- Arkona, port, Mukran Port, offshore, wind farm, germany, Baltic Sea, Rügen