2024-12-23
https://w3.windfair.us/wind-energy/news/26993-race-bank-orsted-uk-offshore-turbine-installation

Race Bank OWF: All Turbines In

91 turbines are now successfully in place and capable of producing green energy.

Official Press Release Ørsted:

Final turbine installed at Race Bank Offshore Wind Farm

The final wind turbine has been installed at Ørsted's Race Bank Offshore Wind Farm, meaning all 91 turbines are now successfully in place and capable of producing green energy.

Race Bank is located off the North Norfolk coast and is using Siemens 6 megawatt (MW) wind turbines. Many of these turbines feature the first blades to be manufactured at the Siemens blade factory in Hull. The installation of the final turbine means the project remains on schedule, with the wind farm expected to be fully operational in early 2018. Important milestone to reach David Summers, our Project Director for Race Bank, said: “I’m delighted that all 91 turbines have been successfully installed at Race Bank. This has been one of the more difficult... ... More: Official Press Release Ørsted

Keywords:
Race Bank, Ørsted, UK, offshore, turbine, installation







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_minimax_logo
  • Newlist_logo.weigt
  • Newlist_8.2_logo_original_twocoloured_screen
  • Newlist_umweltbank_logo-2024-claim_mit-schutzzone
  • Newlist_xervon_engl_logo
  • Newlist_prysmian_logo_rgb
  • Newlist_peikko_logo
  • Newlist_woelfel_logo
  • Newlist_dynamica_ropes_logo_600x200
  • Newlist_logo_idaswind
  • Newlist_stiftung_offshorewind
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_schaeffler_logo
  • Newlist_windrad_logo-1-rgb
  • Newlist_iwtma_logo
  • Newlist_logo.overspeed

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024