2024-12-23
https://w3.windfair.us/wind-energy/news/26539-lm-wind-power-blade-spain-transport-offshore-germany-wind-farm-ge-haliade

LM Wind Power Transports Largest Blade Ever through Spain

The 73.5 meter blade arrives at Castellón Port

Official Press Release LM Wind Power:

LM Wind Power 73.5 meter blade arrives at Castellón Port

It's the largest wind turbine blade ever made and transported in Spain

On October 20, the first LM 73.5 P wind turbine blade successfully arrived at Castellón Port. It is the largest blade ever produced and transported through Spain.  Destined for the Merkur offshore wind farm in Germany to power GE's Haliade 150-6 MW turbine offshore, the 73.5 meter blade began its journey at LM Wind Power's factory in Castellón, and travelled 45 kilometers (km) by road to reach the port. This new size record in Spain reflects the fast development of the wind industry to continuously introduce longer and more complex blades, designed to lower the Levelized Cost of Energy (LCOE) and serve the growing offshore market. Castellón... ... More: Official Press Release LM Wind Power

Keywords:
LM Wind Power, blade, Spain, transport, offshore, Germany, wind farm, GE, Haliade







Related News

Thematically suitable Windfair.net members in the business directory

  • Newlist_kaeufer_logo
  • Newlist_logo.overspeed
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_ts_logo_rgb
  • Newlist_radolid_logo
  • Newlist_windconsult-logo
  • Newlist_anemos_logo_neu
  • Newlist_agile_wind_power_logo1
  • Newlist_logo.engr.wisc
  • Newlist_logo_oat_pitch_control
  • Newlist_logo.hodijcoatings
  • Newlist_woelfel_logo
  • Newlist_logo.tuev-sued-offshore
  • Newlist_energiequelle_logo
  • Newlist_bmu_logo
  • Newlist_umweltbank_logo-2024-claim_mit-schutzzone
  • Newlist_ge_vernova_standard_rgb_evergreen
  • Newlist_bwts_logo_2021
  • Newlist_rosendahl_windtechnik_logo_weiss_neu_druck
  • Newlist_logo.weigt
  • Newlist_eno_energy_ogo_claim

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024