2024-11-05
http://w3.windfair.us/wind-energy/news/25401-dnv-gl-jip-wind-farm-operations-downtime

DNV GL wants to reduce downtime and lower costs of wind farms

The company has set up a Joint Industry Project (JIP) to improve performance for wind farms during their life span of 25 years or more.

Official Press Release DNV GL:

DNV GL invites wind industry to Joint Industry Project to optimize wind farm operations

Optimizing operations will further reduce downtime and lower costs

DNV GL announces its latest Joint Industry Project (JIP), aiming to optimize the performance of wind farms by reducing the downtime and lower the costs of energy during the operational project life span of 25 years or more. Wind farm owners are faced with many challenges to increase availability and performance of wind turbines while driving down the costs. “Modern turbines are meeting the industry performance assumptions of 97% onshore and 94% offshore, but there is room for improvement and even higher performance can be reached by optimised operations driven by a well-managed operations and maintenance strategy,” says Kim Moerk, Executive Vice President Renewables Certification at DNV... ... More: Official Press Release DNV GL

Keywords:
DNV GL, JIP, wind farm operations, downtime







Thematically suitable Windfair.net members in the business directory

  • Newlist_logo_idaswind
  • Newlist_logo.labkotec
  • Newlist_anemos_logo_neu
  • Newlist_logo.overspeed
  • Newlist_sabowind_logo
  • Newlist_logo.tuev-sued-offshore
  • Newlist_geonet_logo
  • Newlist_rts_wind_ag_logo_652x312px
  • Newlist_logo.engr.wisc
  • Newlist_juwi_logo_mit_verlauf_digital_srgb
  • Newlist_wpd-logo
  • Newlist_windrad_logo-1-rgb
  • Newlist_prysmian_logo_rgb
  • Newlist_ts_logo_rgb
  • Newlist_eno_energy_ogo_claim
  • Newlist_umweltbank_logo-2024-claim_mit-schutzzone
  • Newlist_nord_lock_logo
  • Newlist_logo.weigt
  • Newlist_logo_aboenergy

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024