2024-12-23
https://w3.windfair.us/wind-energy/news/25165-lego-burbo-bank-extension-dong-energy-uk

Lego goes green

The LEGO Group reaches 100% renewable energy target three years ahead of schedule by investing in Burbo Bank Extension Offshore Wind Farm in the UK

Official Press Release LEGO:

The LEGO Group reaches 100% renewable energy target three years ahead of schedule

After four years and a DKK 6 billion investment in two offshore wind farms, the LEGO Group has achieved its ambition to balance 100% of its energy use with energy from renewable sources. To celebrate, the LEGO Group has built the largest ever LEGO® brick wind turbine, a Guinness World Records™ title, and challenged children around the world to create their own renewable energy solutions.

Since 2012, the LEGO Group has supported the development of more than 160 megawatts of renewable energy. The latest investment is a 25% stake in the Burbo Bank Extension wind farm off the coast of Liverpool, UK. The wind farm, which was officially opened today, will generate clean power for more than 230,000 British households. “We work to leave a positive impact on the planet... ... More: Official Press Release LEGO

Keywords:
LEGO, Burbo Bank Extension, DONG Energy, UK







Thematically suitable Windfair.net members in the business directory

  • Newlist_umweltbank_logo-2024-claim_mit-schutzzone
  • Newlist_8.2_logo_original_twocoloured_screen
  • Newlist_energyconsult_lifecycleservices_logo
  • Newlist_logo_idaswind
  • Newlist_bmu_logo
  • Newlist_hytorc_logo_1
  • Newlist_irena_logo
  • Newlist_energy_uk_logo
  • Newlist_hannover_messe_logo
  • Newlist_qualitas_energy_logo_blau_dblau
  • Newlist_rosendahl_windtechnik_logo_weiss_neu_druck
  • Newlist_department-of-energy
  • Newlist_logo.afriwea

more results



Keyword Search

© smart dolphin Gmbh 1999 - 2024