10/09/2023
Alcazar Energy announces its acquisition of rights to a 118 MW wind farm project in Montenegro – a major milestone in its ambition to build the largest renewable energy platform in the Western Balkans.
10/06/2023
The Polish Minister of Infrastructure has awarded the ORLEN Group licences for five new offshore wind farm development sites in the Baltic Sea. The planned wind farms will have a capacity of approximately 5.2 GW, generating clean energy for 8 million households.
Strong winds throughout the second half of last month delivered a third consecutive record-breaking month in wind power generation in Ireland.
The scope of the contract covers OSS topside concept design including electrical design which creates a basis for the construction permit.
The analysis finds that targeted intervention in the UK supply chain has the potential to bring £92 billion of GVA into the economy.
The report, which presents the latest deployment and employment figures for the renewable energy and clean technology industry, shows that while progress on renewable power remains positive, until supportive Government policy measures are forthcoming for heat, transport and circular bioresources, it will continually be a challenge for the UK to meet its legally binding net zero commitments.
The green bond funds will be allocated to renewable energy projects which will include investment in smart meters, battery storage, solar and wind generation.
The contract covers inspection and maintenance of cranes, personnel lifts, general lifting, and safety equipment across all of the wind turbines and balance of plant.
The FOW CoE launches a new programme focused on reducing risk and costs associated with floating offshore wind.
Independent media company MIT Technology Review included Ørsted on its new list of 15 climate tech companies to watch
The new test rig with a weight of more than 1000 tons has advanced design features to secure optimised operational efficiency through the test performing, while at the same time reducing critical handling and lifting operations.
ELANTAS GmbH, a subsidiary of the specialty chemicals group ALTANA AG, has finalized the purchase agreement initially signed on August 11, 2023, to acquire a majority stake in Von Roll Holding AG. All competition law clearances and other approvals required for the execution of the purchase agreement, as well as the public tender offer, have been granted.
The order consists of 23 V110-2.0 MW wind turbines and 40 V100-2.0 MW wind turbines all in 2.2 MW operating mode.
Enerfin, one of Spain’s leading mechanical engineering and construction groups, awarded the Nordex Group an order for 45 MW in Spain.
Keep informed - try our weekly Newsletter
Follow us on ,
Join us: Book your Membership
Keyword Search