Posted by: Windfair Editors
Boskalis to connect Hollandse Kust West Beta with onshore grid
Official Press Release Boskalis:
Boskalis consortium awarded Hollandse Kust West Beta export cabling contract
Boskalis has been awarded the Hollandse Kust West Beta export cable contract by TenneT, in consortium with Orient Cables (NBO).
The contract scope comprises the installation of two 65-kilometer-long export cables that will connect the planned Hollandse Kust West Beta 700 MW offshore wind farm to TenneT’s onshore grid in the Netherlands. Furthermore, Boskalis will install a 9-kilometer-long 66kV interconnector cable between the Hollandse Kust West Alpha and Hollandse Kust West Beta offshore substations. Boskalis will execute this contract in consortium with its partner NBO that will design and supply the high-voltage cable system. The two 220kV AC cable circuits will come ashore near the existing onshore high voltage substation at Wijk aan Zee, the Netherlands. The value... ... More: Official Press Release Boskalis
- Keywords:
- Boskalis, contract, TenneT, grid, offshore, Hollandse Kust West, Beta, export cable, wind farm, Orient Cables, grid, onshore, Netherlands